Assessment of the Delays During Implementation of Selected Agriculture Donor Funded Projects in the Zambian Public Sector
“crossref”/

Main Article Content

Mathews Zulu 
Enock Siankwilimba, PhD 
Prof. Erastus Mwanaumo 
Habeenzu Simamba, PhD 

Abstract

Zambia’s Agricultural sector is crucial to realizing the country's Vision 2030 — an efficient, competitive, and export-driven agricultural sector that ensures food security and higher incomes. This study aimed to assess the delays during the implementation of agriculture donor-funded projects in Zambian public sector. The study was guided by three objectives: (i) to ascertain the effect of stakeholder engagement; (ii) to assess the impact of supplier/contractor capacity; and (iii) to analyze the effect of contract management during the implementation of agriculture donor-funded projects. A descriptive research design and a quantitative approach were adopted, focusing on staff from the Project Implementation Units, the Ministry of Agriculture, the Ministry of Fisheries and Livestock, and the Ministry of Finance and National Planning. A sample size of 109 was derived from a population of 120 using stratified random sampling technique. Data was collected using a self-administered structured questionnaire set in a 1 to 5 point Likert Scale format. The Statistical Package for Social Sciences (SPSS) version 30 was used to analysis data. Findings revealed that poor stakeholder engagement was a significant cause of delays, with insufficient understanding of stakeholder expectations and inconsistent involvement often leading to unmet project objectives. The study further found that supplier/contractor capacity was critical to minimizing delays, while many contract managers faced challenges due to work overload, inadequate capacity, and lack of skills. Drawing on international best practices, especially from other African contexts, the study highlighted effective engagement strategies to improve project outcomes in Zambia. These include prioritizing tailored stakeholder engagement strategies supported with a strong policy framework, providing continuous training for PIU staff, appointing independent technical evaluation committees to rigorously assess the technical and financial capabilities of suppliers, and recruiting full-time contract managers for effective contract management oversight.

Article Details

Zulu, M., Siankwilimba, E., Mwanaumo, E., & Simamba, H. (2025). Assessment of the Delays During Implementation of Selected Agriculture Donor Funded Projects in the Zambian Public Sector. African Journal of Management and Business Research, 18(1), 546-577. https://doi.org/10.62154/ajmbr.2025.018.010659
Articles

Copyright (c) 2025 Mathews Zulu, Enock Siankwilimba, PhD, Prof. Erastus Mwanaumo, Habeenzu Simamba, PhD (Author)

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

Prof. Erastus Mwanaumo, University of Zambia.

Prof. Erastus Mwanaumo (PhD Eng, FCIOB, MIoDZ, MRICS, PrCPM, REng, MEIZ, MDRBF),

Director - Directorate of Research, Innovation and Development, University of Zambia.

Habeenzu Simamba, PhD, Graduate School of Business, University of Zambia.

Graduate School of Business, University of Zambia.

African Development Bank. (2022). African Development Bank Group. Retrieved April 14, 2022, from https://www.afdb.org/en/countries/southern-africa/zambia/zambia-and-the-afdb

Ahenkan, A., & Boon, E. (2011). Non-Timber Forest Products (NTFPs): Clearing the Confusion in Semantics. Journal of Human Ecology, 33, 1-9. https://doi.org/10.1080/09709274.2011.11906342. DOI: https://doi.org/10.1080/09709274.2011.11906342

Ahsan, K., & Paul, S. K. (2018). Procurement Issues in Donor-Funded International Development Projects. Journal of Management in Engineering, 34(6), 1-13. DOI:10.1061/(ASCE)ME.1943-5479.0000648. DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000648

Ameyaw, C., Mensah, S., & Osei-Tutu, E. (2012). Public Procurement in Ghana: The Implementation Challenges to the Public Procurement Law 2003 (Act 663). International Journal of Construction Supply Chain Management, 2(https://doi.org/10.14424/ijcscm201012-55-65), 55-56. DOI: https://doi.org/10.14424/ijcscm201012-55-65

Ansah, R. H., & Sorooshian, S. (2018). 4P delays in project management. Engineering, Construction and Architectural Management, xxv(1), 62-76. DOI: https://doi.org/10.1108/ECAM-09-2016-0199

Atieno, O. L., Mutui, F. N., & Wabwire, E. (2019). An Analysis of the Factors Affecting Public Participation in Envronmental Impact Assessment: Case Study of Selected Projects in Nairobi City Country, Kenya. European Scientific Journal, 15(9), 1857-7881. URL:http://dx.doi.org/10.19044/esj.2019.v15n9p284. DOI: https://doi.org/10.19044/esj.2019.v15n9p284

Beil, D. (2009). Supplier Selection. Ann Arbor: Stephen M. Ross School of Business University of Michigan.

Bourne, L., & Walker, D. H. (2005). Visualising and Mapping Stakeholder Influence. Management Decision, 43(5), 649-660. https://doi.org/10.1108/00251740510597680. DOI: https://doi.org/10.1108/00251740510597680

Bruce, P., & Shelley, R. (2010). Assessing Stakeholder Engagement. Communication Journal of New Zealand, 11(2), 30-48.

Chanda, E., & Mumba, P. (2018). Response rates in public-sector surveys: A case study of Zambia. African Journal of Public Administration, 12(2), 45-60.

Chauvet, L., Collier, P., & Fuster, A. (2017). Supervision and Project Performance: A Principal-Agent Approach. Paris: HAL Open Science.

Chisanga, B., Phiri, J., & Mwansa, K. (2020). Gender representation in agricultural development projects in Zambia. Journal of Gender Studies, 29(4), 456-470.

Cleland, D. (1986). Project Stakeholder Management. Project Management Journal, 17(4), 36-44.

Cooper, D. R., & Schindler, P. S. (2011). Business Research Methods. New York: McGraw-Hill/Irwin.

Davis, K. A. (2014). Engaged Language Policy and Practices. Springer Science, 13(2), DOI:10.1007/s10993-013-9296-5. DOI: https://doi.org/10.1007/s10993-013-9296-5

Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003). MegaProjects and Risk: An Anatomy of Ambition. International Journal of Public Sector Management, 17(3. DOI:10.1108/09513550410530199). DOI: https://doi.org/10.1017/CBO9781107050891

Ghanad, A. (2023). An Overview of Quantitative Research Methods. INTERNATIONAL JOURNAL OF MULTIDISCIPLINARY RESEARCH AND ANALYSIS, 6, 3794-3803. DOI: https://doi.org/10.47191/ijmra/v6-i8-52

Hill, C. W., & Jones, G. R. (2001). Strategic Management Theory (6th ed.). New York: Houghton Mifflin Company.

Ika, L. A. (2012). Project management for development in Africa. Why projects are failing and what can be done about it. Project Managment Journal, 43(4), 27-41. DOI:10.1002/pmj.21281. DOI: https://doi.org/10.1002/pmj.21281

Ika, L. A., Diallo, A., & Thuillier, D. (2012). Critical success factors for World Bank projects: An empirical investigation. International Journal of Project Management, 30, (1), 105-116. https://doi.org/10.1016/j.ijproman.2011.03.005. DOI: https://doi.org/10.1016/j.ijproman.2011.03.005

Institute of Economic and Social Research. (2018). University of Zambia. Retrieved May 26, 2022, from https://www.unza.zm/institutes/inesor/research/agricultural-and-rural-development

Jasen, D., & Rautenbach, E. (2023, June). GrandCoach. Retrieved from GrandCoach: https://gradcoach.com/research-philosophy/

Jepsen, A. L., & Eskerod, P. (2013). Project Stakeholder Management (1 ed.). London: https://doi.org/10.4324/9781315245881. DOI: https://doi.org/10.4324/9781315245881

Kabwe, M., & Munkombwe, J. (2019). Educational qualifications and their impact on survey responses in Zambia. Journal of African Studies, 14(3), 234-250.

Kothari, C. (2004). Research Methodology (Methods and Techniques). New Delhi: New Age International Publishers.

Kuphanga, D. (2024). Questionnaires in Research: Their Role, Advantages, and Main Aspects. ResearchGate, DOI:10.13140/RG.2.2.15334.64325.

Lawani, A., & Moore, D. (2016). Project Management Practices in Government Organisations Developing Countries: Systematic Review. The International Journal of Business and Management, 4(9), 89-98.

Lokhande, A., & Harsha, S. (2018). Enhancing the impact of good governance through effective use of Project Management. Bangalore: PMI International Research and Academic Conference.

Lorko, M., Servátka, M., & Zhang, L. (2025). A Better Way to Avoid Project Delays. MIT Sloan Management Review, Vol. 66 ISS. 2: 18-19.

Lusaka Times. (2015). Lusaka Times. Retrieved March 15, 2024, from https://www.lusakatimes.com/2015/03/03/lucky-mulusa-gets-state-house-job/

Mang'atu, M. B., Barmasi, K. J., & Mutuku, K. J. (2025). Community Engagement; An analysis of Performance of Donor Sponsored Projects in Low Resource Countries. Startfprd Journals, https://doi.org/10.53819/81018102t5358. DOI: https://doi.org/10.53819/81018102t5358

Memon, A. H., Rahman, I. A., & Azis, A. A. (2011). Preliminary Study on Causative Factors Leading to Construction Cost Overrun. International Journal of Sustainable Construction Engineering and Technology, 2(1), 57-71.

Muller, R., & Turner, J. R. (2005). The impact of principal-agent relationship and contract type on communication between project owner and manager. International Journal of Project Management, 23(5), 398-403. DOI: https://doi.org/10.1016/j.ijproman.2005.03.001

Muriithi, N., & Crawford, L. (2003). Approaches to Project Management in Africa: Implications for International Development Projects. International Journal of Project Management, 21, 309-319. https://doi.org/10.1016/S0263-7863(02)00048-0. DOI: https://doi.org/10.1016/S0263-7863(02)00048-0

Mwanaumo, E. M., Mambwe, M., Mwanza, B. G., & Sibalwa, E. (2020). An Investigation of Factors Causing Schedule Overrun in Telecommunication Projects in Zambia (Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020). Harare, Zimbabwe: IEOM Society International.

Mwansa, K., & Phiri, J. (2018). Roles and responsibilities in donor-funded projects: A Zambian case study. Journal of Public Administration, 10(2), 67-82.

Mwansa, K., Phiri, J., & Chisanga, B. (2020). Educational profiles of respondents in agricultural development projects. African Journal of Education and Development, 8(1), 23-40.

Nanèma, M., Nassè, T. B., & Ouédraogo, A. (2021). Determinates of the Performance of Development Projects in Developing Countries. International Journal of Management & Entrepreneurship Research, 3(1), 11-29. DOI: https://doi.org/10.51594/ijmer.v3i1.200

Ngesa, A. R. (2021). INFLUENCE OF INSTITUTIONAL FACTORS IN TIMELY COMPLETION OF INFRASTRUCTURE PROJECTS: A CASE OF WORLD BANK FINANCED PROJECTS IN THE ROAD SUB-SECTOR IN KENYA. Nairobi: University of Nairobi.

Nkomesha, U. (2023). News Diggers. Retrieved March 10, 2024, from https://diggers.news/local/2023/03/18/hh-sets-up-a-presidential-delivery-unit/

Nundwe, M., & Mulenga, M. N. (2017). Delays in Construction of Electrical Power Transmission Lines in Zambia. American Scientific Research Journal for Engineering, Technology, and Sciences, 30(1), 82-96.

Nzamu, J. M. (2016). Determinants of Implementation of Government Funded Projects: Case of The Judiciary Refurbishment of Courts in The North Coast Region, Kenya. Nairobi: University of Nairobi.

Ogbeifun, E., & Pretorius, J.-H. C. (2022). Investigation of factors responsible for delays in the execution of adequately funded construction projects. Engineering Management in Production and Services, 93-102. DOI: https://doi.org/10.2478/emj-2022-0008

Olander, S., & Landin, A. (2005). Evaluation of Stakeholder Influence in the Implementation of Construction Projects. International Journal of Project Management, 23(4. DOI:10.1016/j.ijproman.2005.02.002), 321-328. DOI: https://doi.org/10.1016/j.ijproman.2005.02.002

Park, J. E. (2021). Schedule delays of major projects: what should we do about it? Transport Reviews, 814-832. https://doi.org/10.1080/01441647.2021.1915897. DOI: https://doi.org/10.1080/01441647.2021.1915897

Pinto, J., & Slevin, D. (1987). Critical Factors in Successful Project Implementation. IEEE Transactionson Engineering Management, 34(1), 22-27. DOI: https://doi.org/10.1109/TEM.1987.6498856

Project Management Institute. (2013). A Guide to The Project Management Body of Knowledge (5th ed.). Newtown Square, PA: Project Management Institute.

Ramus, C. A., & Steger, U. (2000). The Role of Supervisory Support Behaviors and Environmental Policy in Employee ‘Ecoinitiatives’ at Leading Edge European Companies. Academy of Management Journal, 43(4), 605-626. DOI:10.2307/1556357. DOI: https://doi.org/10.2307/1556357

Reed, M. S., Graves, A., Dandy, N., Posthumus, H., Hubacek, K., Morris, J., . . . Stringer, L. C. (2009). Who's in and why? A typology of stakeholder analysis methods for natural resource management. Journal of Environmental Management, 90(5), 1933-1949. https://doi.org/10.1016/j.jenvman.2009.01.001. DOI: https://doi.org/10.1016/j.jenvman.2009.01.001

Rogers, K. K., Akims, M. A., & Kakwezi, J. (2024). Contract Management Practice And Procurement Performance of Rwanda Interlink Transport Company. Educational Administration: Theory and Practice, 30(7), 192-202.

Sekaran, U., & Bougie, R. (2010). Research Methods For Business. A Skill-Building Approach (5 ed.). West Sussex, UK: John Wiley and Sons Ltd.

Singh, A. S., & Masuku, M. B. (2014). Sampling Techniques & Determination of Sample Size in Applied Statistics research: An Overview. International Journal of Economics, Commerce and Management, II(11), 1-22.

Smith, J. A., Groffith, D. M., White, A., Baker, P., Watkins, D. C., Drummond, M., & Semlow, A. (2020). COVID-19, EQUITY AND MEN’S HEALTH: USING EVIDENCE TO INFORM FUTURE PUBLIC HEALTH POLICY, PRACTICE AND RESEARCH RESPONSES TO PANDEMICS. International Journal of Mens Social and Community Health, 3 (1), e48-e64. DOI: https://doi.org/10.22374/ijmsch.v3i1.42. DOI: https://doi.org/10.22374/ijmsch.v3i1.42

Szilvia, V. (2013). Research Methodology. Debrecen.

Taherdoost, H. (2022). What are Different Research Approaches? Comprehensive Review of Qualitative,Quantitative, and Mixed Method Research,Their Applications, Types, and Limitations. Journal of Management Science & Engineering Research, 5(1), 53-63. DOI: https://doi.org/10.30564/jmser.v5i1.4538

Tamminen, K. A., & Poucher, Z. A. (2020). The Routledge International Encyclopedia of Sport and Exercise Psychology: Volume 1: Theoretical and Methodological Concepts. London: Routledge.

Tembo, C. K., Muleya, F., & Kalumbi, P. (2022). An investigation into pre-project planning challenges on public building project in Zambia. In I. Musonda, & E. Mwanaumo (Eds.), Building Smart, Resilient and Sustainale infrastrucure in Developing Countries (p. 9). Johannesburg: Taylor & Francis Group. DOI: https://doi.org/10.1201/9781003325321-5

Tulu, T. (2017). Determinants of project implementation delay: the case of selected projects financed by development bank of Ethiopia. Journal of Business and Administrative Studies, 9(2), 1-45.

Turner, J. (2006). Towards a theory of project management: The nature of the project governance and project management. International Journal of Project Management, 24(2), 93-35. DOI:10.1016/j.ijproman.2005.11.008. DOI: https://doi.org/10.1016/j.ijproman.2005.11.008

Turner, R. (2016). Gower Handbook of Project Management. London: Routledge. https://doi.org/10.4324/9781315585741. DOI: https://doi.org/10.4324/9781315585741

Uniproject Materials blog. (2016, December 3). Uniproject Materials. Retrieved from Uniproject Materials blog: https://uniprojectmaterials.com/view-blog/how-to-calculate-a-relaible-sample-size-using-taro-yamane-method

Walker, D. H., & Lloyd-Walker, B. (2016). Understanding the motivation and context for alliancing in the Australian construction industry. International Journal of Managing Projects in Business, 9(1), 74-93. DOI:10.1108/IJMPB-07-2015-0065. DOI: https://doi.org/10.1108/IJMPB-07-2015-0065

Watt, D. J., Kayis, B., & Willey, K. (2010). The relative importance of tender evaluation and contractor selection criteria. International Journal of Project Management, 28(1), 51-60. DOI:10.1016/j.ijproman.2009.04.003. DOI: https://doi.org/10.1016/j.ijproman.2009.04.003

West, R., & Turner, L. H. (2018). An Introduction to Communication (illustrated ed.). Cambridge University Press.

Zakeri, S., Konstantas, D., Bratvold, R. B., & Pamucar, D. (2023). A Supplier Selection Model Using the Triangular Fuzzy-Grey Numbers. Institue of Electrical and Electronnics Engineers, 11, 107511-107532. DOI: https://doi.org/10.1109/ACCESS.2023.3320032

Zambia Development Agency. (2024). Zambia Development Agency (ZDA). Retrieved March 20, 2024, from https://www.zda.org.zm/agriculture/